Tyburn Sewage Lift Station Bypass Connection
This is the finished bypass connection that was constructed last summer at the Tyburn Sewage Lift Station so that the station pumps can be bypassed in an emergency.
Attached are photos of one of the Authority’s Capital Improvement Programs underway at its Tyburn Sewage Lift Station.
The Authority is installing an emergency sewage bypass system at its Tyburn Lift Station to prevent an accidental sewage discharge in the event of a major station malfunction.
The bypass will maintain sewage flows to the treatment plant while the station malfunction is corrected.